- DTCP Approved Premium Asset
Honey County
- Kothapally, Sagar Highway Corridor
5.5
Total Acres
DTCP
Approved Layout
₹ 10k
Starting Price
Project Facts
Honey County
Location
Kothapally, Sagar Highway
Total Area
5.5 Acres
Approval
DTCP Approved
₹ 10,000.00
Developer
Balaji Infra Developers
Facing
All Facings Available
Status
Ready for Registration
Meticulously Planned & Approved
The Vision
Honey County: Modern Living in Natural Tranquility
Welcome to Honey County, a premium residential layout developed by Balaji Infra Developers. Located in the serene and fast-developing region of Kothapalli, Yacharam, Rangareddy, Honey County offers a perfect blend of modern living and natural tranquility.
Honey County spans 5.5 acres of DTCP-approved layout, offering vastu-compliant residential plots designed to suit modern living standards. The layout is meticulously planned with wide roads, ample green spaces, and infrastructure that ensures safety and convenience for you and your family.
Whether you’re looking for a peaceful place to settle down or a valuable investment opportunity, Honey County is the perfect choice. The strategic location ensures appreciation in property value while fostering a community spirit among residents.
Lifestyle
Avatar Prime Amenities
Grand Entrance Arch
CC Camera Surveillance
Park & Play Area
Street Lighting
Walking Track
Cycling Track
Avenue Plantation
Vastu Compliant
Overhead Water Tank
Compound Wall
Gallery
Project Visuals
Infrastructure
DTCP Standard Features
- Layout Designed as per Vastu
- Electricity with transformers & street lighting
- Walking and cycling tracks
- Avenue plantation and landscaping
- Compound wall with Entrance Arch
- Overhead water tank & water lines
- Wide 33 ft. and 40 ft. internal roads
- Park with children’s play area
- Full-fledged drainage system
- Rainwater harvesting pits
- CC camera surveillance 24/7
Connectivity
Proximity Analysis
05 Mins
Sagar Highway
Immediate access to the main corridor.
10 Mins
Upcoming Railway Station
Future-ready transit connectivity.
15 Mins
RRR (Regional Ring Road)
Strategic junction for state-wide access.
30 Mins
Amazon Data Centre
Proximity to global tech infrastructure.
38 Mins
ORR Exit-12
Seamless connectivity to Outer Ring Road.
65 Mins
International Airport
Global travel access.
Financial Partners












